skip to content
 

The Effect of Capacity Payments on Peaking Generator Availability in PJM

Presented by: 
Stein-Erik Fleten Norwegian University of Science and Technology
Date: 
Wednesday 20th March 2019 - 11:15 to 12:00
Venue: 
INI Seminar Room 1
Abstract: 
We study the effects of capacity payments on the strategic decisions of plant managers for peaking units in the PJM Interconnection. We achieve this through a structural estimation of maintenance and switching costs between the operational state, the standby state and retirement of generating units, using annual data from 2001-2016. The empirical data shows less switching between states after the introduction of capacity remunerations in 2007. We find that the role of peaking units has changed, with the units being dispatched more often. In the counterfactual analysis, we find a clear connection between the level of capacity payments and switching. We conclude that the current level of capacity payments in PJM incentivizes peaking units to stay in the operational state.

Stein-Erik Fleten (with Benjamin Fram, Magne Ledsaak, Sigurd Mehl, Ola Røssum, Carl Ullrich)
The video for this talk should appear here if JavaScript is enabled.
If it doesn't, something may have gone wrong with our embedded player.
We'll get it fixed as soon as possible.
Presentation Material: 
University of Cambridge Research Councils UK
    Clay Mathematics Institute London Mathematical Society NM Rothschild and Sons